WEEKLY ROADWORK FOR APRIL 17 TO APRIL 23, 2022
Weather permitting for all road work
DISTRICT 1
(Pu‘u‘eo, Wainaku, Kaiwiki, Pauka‘a, Papa‘ikou, Onomea, Pepe‘ekeo, Honomū, Wailea, Hakalau, Ninole, Papa‘aloa, Laupāhoehoe, Waipunalei, O‘okala, Pa‘auilo, Pa‘auhau, Honoka‘a, Kukuihaele, Waipio, Āhualoa, Portion of Kamuela, Pleasant Acres, Nani Waimea, Kamuela Highlands, Kamuela Lakeland, Kamuela Meadows, Kamuela Havens)
KA’AHIKINI BRIDGE & KOLEKOLE BRIDGE
Bridge closed; Detour – use Chin Chuck and Kanna Road.
MAKEA BRIDGE
Bridge open; Kaupākuea Homestead Road – north of Andrade Rd.
DISTRICT 2
(Downtown Hilo, Bayfront, Wailoa, Portion of Waiākea House lots, University Heights, Komohana Gardens, Portion of Waiākea- Uka, Lanakila, Mohouli, Ainako, Kaūmana, Pi‘ihonua, Wailuku, Waiānuenue)
WAIĀNUENUE AVE
Construction Project: Waiānuenue Ave. Rehab. Kalulani Street to Rainbow Drive. Lane shifts/closures; Utility adjustments, Concrete curb and sidewalk repair, roadway paving; 8:30 am-3:00 pm
WAIĀNUENUE AVE~NIGHT WORK
Construction Project: Waiānuenue Ave. Rehab. Kalulani Street to Rainbow Drive. Lane shifts/closures; Roadway paving; 7:00PM-5:00AM
WEST LAUNIKAULA ST (KINO’OLE ST TO KILAUEA AVE)
Shoulder Maintenance- One lane closure; Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm
KAUMANA DRIVE (COUNTRY CLUB DR & KUAKOLU PLACE)
Survey/Layout Work- One lane closure; Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm
DISTRICT 3
(Banyan Drive, Keaukaha, Hilo Industrial Area, University of Hawai‘i at Hilo, Puainako House lots, Kawailani House lots, Haihai Subdivision, Portion of Waiākea Homesteads, Waiākea-Uka, Pana‘ewa, Macadamia Nut Farms, 8-1/2 mile Camp, Kūlani, Kea‘au Shopping Area, Kea‘au High School)
KILAUEA AVE
Construction Project: Kilauea Ave. Rehab. Wailoa Bridge to Puainako Street; Lane closures, lane shifts, officers directing traffic. Lane striping layout from 8:00 am to 3:00 pm
KILAUEA AVE
Water Valve Repair- Lane closures, lane shifts, officers directing traffic from 7:00 pm to 5:00 am
KALANIANA’OLE AVE
Construction Project: Kalaniana’ole Ave Reconstruction, Kamehameha/Railroad Ave. to Ka’uhane Ave. One-way traffic pattern loop between Railroad Ave. and Silva Street. Hawaiian Tel Utility Line Work
KĪNO’OLE AVE
Install pavement markings on resurfaced sections of roadway. Expect officers directing traffic and minor delays; 8:00 am to 2:00 pm.
PUAINAKO ST-HWY 2000
Shoulder Work (Triton Replacement) One lane closure; Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm
DISTRICT 4
(Hawaiian Paradise Park, Hawaiian Beaches, Makai of Pāhoa Town, Nanawale Estates, Leilani Estates, Pohoiki, Kapoho)
HAWAIIAN BEACHES (EAST PUNI PAKA)
Paving- One lane closure; Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm
HAWAIIAN BEACHES (SOUTH PUNI MAKAI LOOP)
Tree Trimming- One lane closure; Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm
DISTRICT 5
(W.H. Shipman Industrial Park, 9-1/2 mile Camp, Kea‘au Ag Lots, Kurtistown, Mt. View, Glenwood, Orchidland Estates, Ainaloa, Hawaiian Acres, Fern Acres, Eden Roc, Fern Forest Estates, Mauka of Pāhoa Town, Kaohe Homesteads, Kamaili Homesteads, Kalapana, Opihikao, Kehena, Kaimu)
MOHO ROAD
Maintenance pavement markings- Expect officers directing traffic and minor delays from 8:00 am to 2:00 pm.
NORTH PSZYK RD
Tree Removal awarded Contractor- One lane closure, flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
DISTRICT 7
(Portion of Kealakekua, Kona Scenic Subdivision, Kainaliu, Honalo, Keauhou, Kahalu‘u, Hōlualoa, Kona Hillcrest, Pualani Estates, Sunset View, Kuakini Heights, Kona Vistas, Ali‘i Heights, Kona Industrial, Lono Kona)
PALANI ROAD (Henry St to HWY 180 Mamalahoa Highway Junction)
Paving- One lane closure, Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
DISTRICT 9
(Mauna Lani Resort, Waikōloa Village, Puakō, Waiki‘i, Portion of Waimea, Kamuela, Pu‘ukapu Farms, Pu‘ukapu Homesteads, Pu‘ukapu Village House Lots, Luala‘i, Pu‘u‘ōpelu, Lalamilo, Wai‘aka, Kawaihae, Kohala Ranch, Mahukona, Hawi, Kapa‘au, Hala‘ula)
SADDLE ROAD (MM 51-53)
Shoulder Maintenance- Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
KA’AUHUHU HOMESTEAD RD
Shoulder Maintenance- One lane closure, flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
KYNNERSLEY RD
Shoulder Maintenance- One lane closure, flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
PAKANU ST
Install pavement markings on resurfaced sections of roadway. Expect officers directing traffic and minor delays; 8:00 am to 2:00 pm