County Roads Roadwork for March 20-26, 2022
Weather permitting for all road work
DISTRICT 1
(Pu‘u‘eo, Wainaku, Kaiwiki, Pauka‘a, Papa‘ikou, Onomea, Pepe‘ekeo, Honomū, Wailea, Hakalau, Ninole, Papa‘aloa, Laupāhoehoe, Waipunalei, O‘okala, Pa‘auilo, Pa‘auhau, Honoka‘a, Kukuihaele, Waipio, Āhualoa, Portion of Kamuela, Pleasant Acres, Nani Waimea, Kamuela Highlands, Kamuela Lakeland, Kamuela Meadows, Kamuela Havens)
CARLSMITH ROAD (ONOMEA)
Shoulder Maintenance – Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
KA’AHIKINI BRIDGE & KOLEKOLE BRIDGE
Bridge closed; Detour – use Chin Chuck and Kanna Road.
MAKEA BRIDGE
Bridge open; Kaupākuea Homestead Road – north of Andrade Rd
KAUPAKUEA HOMESTEAD ROAD
Install pavement markings on the resurfaced section of the roadway. Expect officers directing traffic and minor delays from 9:30 am to 1:30 pm.
DISTRICT 2
(Downtown Hilo, Bayfront, Wailoa, Portion of Waiākea Houselots, University Heights, Komohana Gardens, Portion of Waiākea- Uka, Lanakila, Mohouli, Ainako, Kaūmana, Pi‘ihonua, Wailuku, Waiānuenue)
WAIĀNUENUE AVE
Construction Project: Waiānuenue Ave. Rehab., Kalulanl Street to Rainbow Drive. Lane shifts/closures; Utility adjustments, Concrete curb and sidewalk repair, roadway paving; 8:30 am-3:00 pm
WAIĀNUENUE AVE ~ NIGHT WORK
Construction Project: Waiānuenue Ave. Rehab., Kalulanl Street to Rainbow Drive. Lane shifts/closures; Roadway paving; 7:00PM-5:00AM
DISTRICT 3
(Banyan Drive, Keaukaha, Hilo Industrial Area, University of Hawai‘i at Hilo, Puainako Houselots, Kawailani Houselots, Haihai Subdivision, Portion of Waiākea Homesteads, Waiākea-Uka, Pana‘ewa, Macadamia Nut Farms, 8-1/2 mile Camp, Kūlani, Kea‘au Shopping Area, Kea‘au High School)
KILAUEA AVE
Construction Project: Kilauea Ave. Rehab., Wailoa Bridge to Puainako Street; Lane closures, lane shifts, officers directing traffic. Lane striping layout from 8:00 am to 3:00 pm
KALANIANA’OLE AVE
Construction Project: Kalaniana’ole Ave Reconstruction, Kamehameha/Railroad Ave. to Ka’uhane Ave. One-way traffic pattern loop between Railroad Ave. and Silva Street.
KINO’OLE AVEInstall pavement markings on resurfaced sections of roadway. Expect officers directing traffic and minor delays; from 8:00 am to 2:00 pm.
DISTRICT 4
(Hawaiian Paradise Park, Hawaiian Beaches, Makai of Pāhoa Town, Nanawale Estates, Leilani Estates, Pohoiki, Kapoho)
HAWAIIAN BEACHES
Northside of Kahakai Blvd (N Popaa Street, N Puni Paka, and N Puni Kahakai) Paving- One lane closure; Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm
DISTRICT 6
(Volcano Village, Hawaiian Orchid Island Estates, Pahala, Punalu‘u, Nā‘ālehu, South Point, Ocean View, Miloli‘i, Ho‘okena, Hōnaunau, Ke‘ei, Nāpō‘opo‘o, Captain Cook, Portion of Kealakekua, Keōpuka Heights, Kona Hospital, Keōpuka Kai)
UPPER AND LOWER NAPO’OPO’O ROAD
Herbicide Maintenance-Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
DISTRICT 7
(Portion of Kealakekua, Kona Scenic Subdivision, Kainaliu, Honalo, Keauhou, Kahalu‘u, Hōlualoa, Kona Hillcrest, Pualani Estates, Sunset View, Kuakini Heights, Kona Vistas, Ali‘i Heights, Kona Industrial, Lono Kona)
ALI’I DRIVE
(Kam III South to Napo’opo’o Junction)Herbicide Maintenance- Expect officers directing traffic and minor delays; from 8:00 am to 2:00 pm.
PALANI ROAD
(Henry St to HWY 180 Mamalahoa Highway Junction)Shoulder Maintenance- Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
PALANI ROAD
(Henry St to HWY 19)Maintenance pavement markings- Expect officers directing traffic and minor delays from 8:00 am to 2:00 pm.
DISTRICT 9
(Mauna Lani Resort, Waikōloa Village, Puakō, Waiki‘i, Portion of Waimea, Kamuela, Pu‘ukapu Farms, Pu‘ukapu Homesteads, Pu‘ukapu Village House Lots, Luala‘i, Pu‘u‘ōpelu, Lalamilo, Wai‘aka, Kawaihae, Kohala Ranch, Mahukona, Hawi, Kapa‘au, Hala‘ula)
SADDLE ROAD (MM 46-52)
Shoulder Maintenance- Flaggers directing traffic; large trucks and personnel will be on the roadway from 8:00 am to 2:00 pm.
PANIOLO AVENUE
(KTA to Ho’oko St)Install pavement markings on resurfaced sections of roadway. Expect officers directing traffic and minor delays; from 8:30 am to 2:00 pm.