Big Island Thieves

Home Local News County Road & Highways Roadwork and Lane Closures for May 1 – 7, 2022

County Road & Highways Roadwork and Lane Closures for May 1 – 7, 2022

by Thunda
1.2K

DISTRICT 1

(Pu‘u‘eo, Wainaku, Kaiwiki, Pauka‘a, Papa‘ikou, Onomea, Pepe‘ekeo, Honomū, Wailea, Hakalau, Ninole, Papa‘aloa, Laupāhoehoe, Waipunalei, O‘okala, Pa‘auilo, Pa‘auhau, Honoka‘a, Kukuihaele, Waipio, Āhualoa, Portion of Kamuela, Pleasant Acres, Nani Waimea, Kamuela Highlands, Kamuela Lakeland, Kamuela Meadows, Kamuela Havens)

KA’AHIKINI BRIDGE & KOLEKOLE BRIDGE

Bridge closed; Detour – use Chin Chuck and Kanna Road.

MAKEA BRIDGE

Bridge open; Kaupākuea Homestead Road – north of Andrade Rd.

HWY 240 (MM 5-6) HONOKA’A-WAIPIO ROAD

Tree Trimming- One lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm


DISTRICT 2

(Downtown Hilo, Bayfront, Wailoa, Portion of Waiākea House lots, University Heights, Komohana Gardens, Portion of Waiākea- Uka, Lanakila, Mohouli, Ainako, Kaūmana, Pi‘ihonua, Wailuku, Waiānuenue)

WAIĀNUENUE AVE

Construction Project: Waiānuenue Ave. Rehab. Kalulani Street to Rainbow Drive. Lane shifts/closures; Utility adjustments, Concrete curb and sidewalk repair, roadway paving; 8:30am-3:00pm

WAIĀNUENUE AVE~NIGHT WORK

Construction Project: Waiānuenue Ave. Rehab. Kalulani Street to Rainbow Drive. Lane shifts/closures; Roadway paving; 7:00PM-5:00AM

WEST LAUNIKAULA ST (KINO’OLE ST TO KILAUEA AVE)

Shoulder Maintenance- One lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm

AUPUNI ST (KILAUEA AVE TO PAUAHI ST)

Tree Removal- One lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm

DISTRICT 3


(Banyan Drive, Keaukaha, Hilo Industrial Area, University of Hawai‘i at Hilo, Puainako House lots, Kawailani House lots, Haihai Subdivision, Portion of Waiākea Homesteads, Waiākea-Uka, Pana‘ewa, Macadamia Nut Farms, 8-1/2 mile Camp, Kūlani, Kea‘au Shopping Area, Kea‘au High School)

KILAUEA AVE

Construction Project: Kilauea Ave. Rehab. Wailoa Bridge to Puainako Street; Lane closures, lane shifts, officers directing traffic. Lane striping layout from 8:00am to 3:00pm

KILAUEA AVE

Water Valve Repair- Lane closures, lane shifts, officers directing traffic from 7:00pm to 5:00am

KALANIANA’OLE AVE

Construction Project: Kalaniana’ole Ave Reconstruction, Kamehameha/Railroad Ave. to Ka’uhane Ave. One-way traffic pattern loop between Railroad Ave. and Silva Street. Hawaiian Tel Utility Line Work

KĪNO’OLE AVE

Install pavement markings on resurfaced sections of roadway. Expect officers directing traffic and minor delays; 8:00am to 2:00pm.

PUAINAKO ST-HWY 200

Shoulder Work (Triton Replacement) One lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm


DISTRICT 4

(Hawaiian Paradise Park, Hawaiian Beaches, Makai of Pāhoa Town, Nanawale Estates, Leilani Estates, Pohoiki, Kapoho)

HAWAIIAN BEACHES (EAST PUNI PAKA)

Paving- One lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm 

HAWAIIAN BEACHES (SOUTH PUNI MAKAI LOOP)

Tree Trimming- One lane closure; Flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm


DISTRICT 5

(W.H. Shipman Industrial Park, 9-1/2 mile Camp, Kea‘au Ag Lots, Kurtistown, Mt. View, Glenwood, Orchidland Estates, Ainaloa, Hawaiian Acres, Fern Acres, Eden Roc, Fern Forest Estates, Mauka of Pāhoa Town, Kaohe Homesteads, Kamaili Homesteads, Kalapana, Opihikao, Kehena, Kaimu)

MOHO ROAD

Maintenance pavement markings- Expect officers directing traffic and minor delays from 8:00am to 2:00pm. 

MOHO ROAD (BETWEEN B & C)

Road Repairs-Expect lane closures and lane shifts from 8:30 am to 3:00 pm.

NORTH OSHIRO (KA’AWALE ST/HAUMALU INTERSECTION)

Road Repairs-Expect lane closures and lane shifts from 8:30 am to 3:00 pm.

NORTH PSZYK RD

Tree Removal awarded Contractor- One lane closure, flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm.


DISTRICT 7

(Portion of Kealakekua, Kona Scenic Subdivision, Kainaliu, Honalo, Keauhou, Kahalu‘u, Hōlualoa, Kona Hillcrest, Pualani Estates, Sunset View, Kuakini Heights, Kona Vistas, Ali‘i Heights, Kona Industrial, Lono Kona)

PALANI ROAD (Henry St to HWY 180 Mamalahoa Highway Junction)

Paving- One lane closure, Flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm.


DISTRICT 9

(Mauna Lani Resort, Waikōloa Village, Puakō, Waiki‘i, Portion of Waimea, Kamuela, Pu‘ukapu Farms, Pu‘ukapu Homesteads, Pu‘ukapu Village House Lots, Luala‘i, Pu‘u‘ōpelu, Lalamilo, Wai‘aka, Kawaihae, Kohala Ranch, Mahukona, Hawi, Kapa‘au, Hala‘ula) 

SADDLE ROAD (MM 51-53)

Shoulder Maintenance- Flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm.

KA’AUHUHU HOMESTEAD RD

Shoulder Maintenance- One lane closure, flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm. 

KYNNERSLEY RD

Shoulder Maintenance- One lane closure, flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm.

 PAKANU ST

Install pavement markings on resurfaced sections of roadway. Expect officers directing traffic and minor delays; 8:00am to 2:00pm

OMACHI RD (AKONI PULE HWY TO AKONI PULE RD)

Tree Removal by Contractor- One lane closure, flaggers directing traffic; large trucks and personnel will be on roadway from 8:00am to 2:00pm. 

AKONI PULE HWY (KAWAIHAE TO HAWI)

Install pavement markings-Expect officers directing traffic and minor delays; 8:00am to 2:00pm

Related Articles

Leave a Comment Cancel Reply

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy
Exit mobile version