DOH Issues $8.7 Million Fine, Orders Navy to Make Critical Repairs to Pearl Harbor Wastewater Treatment Plan

by Thunda
2 minutes read

The Hawaiʻi Department of Health (DOH) issued a Notice of Violation and Order (NOVO) to the United States Navy to address a myriad of deficiencies at the NAVFAC Hawaii Wastewater Treatment Plant near Pearl Harbor. Numerous operation and maintenance issues led to repeated discharges of untreated or partially treated sewage to state waters.  

DOH assessed an $8,776,250.00 penalty based on 766 counts of discharging pollutants in exceedance of permit limits, 17 counts of unauthorized bypass, and 212 counts of operation and maintenance failures. DOH is ordering corrective actions to address critical violations. 

“The Navy’s failure to properly operate and maintain this wastewater treatment plant led to the pollution of state waters,” said Deputy Director of Environmental Health Kathleen Ho. “We are taking action to protect our state’s water resources and to hold the Navy accountable to make critical repairs and prevent a potential catastrophic failure of the facility.”

Violations include:

  • Discharging effluent that exceeded Enterococci and other contaminant limits
  • Unauthorized bypass of sand filters due to leaving a bypass valve open
  • Unauthorized bypass of sand filters due to poor operation and maintenance
  • Failure to operate and maintain aeration basin treatment units
  • Failure to operate and maintain sand filter bypass valve
  • Failure to operate and maintain ultraviolet disinfection systems
  • Failure to operate and maintain critical final effluent pumps

DOH is ordering the Navy to take a wide range of corrective actions, including:

  • Assessing the condition of the facility and repairing issues/items identified from the assessment
  • Repairing the ultraviolet disinfection system to ensure adequate backup capabilities
  • Identifying and clearing all backlogged preventive and corrective maintenance
  • Exercising all valves to ensure full functionality
  • Conducting a structural integrity assessment of the aeration basins and completing repairs
  • Obtaining a root cause analysis for recent effluent pump failures
  • Revising and implementing an updated operations and maintenance plan based on an assessment and plan developed to optimize operations and process control protocols for the facility

The Navy may submit a request for a hearing and contest the NOVO within 20 days of its

receipt.

Click here to download a copy of the NOVO.

Related Articles

Leave a Reply

About Us

BigIslandThieves.com is not your parents’ news — and we’re proud of it. We’re an independent, community-powered media platform that brings raw, real, and relevant news and updates to the people of Hawaii.

 

Our content is powered by you, the community, because Hawaii deserves media that reflects its people, not just headlines.

This isn’t corporate news. This isn’t filtered press. This is Hawaii’s heartbeat — live, loud, and unfiltered.

Popular Seaches

Follow Us

Subscribe to Email Blast

Enter your email address to subscribe to an email blast and receive notifications of new posts by email.

©2025 Big Island Thieves Media, A Media Company – All Right Reserved. Designed and Developed by Ha Toa LLC
Big Island Thieves Media

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More

Privacy & Cookies Policy