Big Island Thieves

State Road and Highways Roadwork and Lane Closures for September 24 – 30, 2021

FOR THE WEEK OF  SEPTEMBER 24 – SEPTEMBER 30

PLEASE NOTE:

Lane closure schedules may change at any time without further notice.  All projects are weather permitting.

— MAMALAHOA HIGHWAY (ROUTE 11) —

1) MOUNTAIN VIEW TO VOLCANO

Shoulder closure on Mamalahoa Highway (Route 11) possible in either direction between Oshiro Road and Alii Koa Street, on Monday, Sept. 24, through Friday, Sept. 30, from 8:30 a.m. to 3 p.m., for surveying.

2) PAHALA (WEEKEND WORK)

Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile markers 53.5 and 54.5, vicinity of Kaalaiki Road, on Saturday, Sept. 24, and Sunday, Sept. 25, from 8:30 a.m. to 8:30 p.m., for landscaping and vegetation cutting.

3) NAALEHU

Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile markers 60.5 and 63.5, vicinity of Whittington Beach Park and Niu Street, on Monday, Sept. 26, through Friday, Sept. 30, from 8:30 a.m. to 5 p.m., for landscaping and vegetation cutting.

4) CAPTAIN COOK (WEEKEND/WEEKLY WORK)

Single lane closure on Mamalahoa Highway (Route 11) possible in either direction between mile markers 107 and 109, Keei/Rabbit Hill Road and Captain Cook Village Road, on Saturday, Sept. 24, through Friday, Sept. 30, from 8:30 a.m. to 5 p.m., for landscaping, vegetation cutting, and shoulder work.

— KUAKINI HIGHWAY (ROUTE 11) —

1) HONALO

Single lane closure on Kuakini Highway (Route 11) possible in either direction between mile marker 113.9 and 114, vicinity of Honalo Road, on Monday, Sept. 26, through Friday, Sept. 30, from 8:30 a.m. to 3 p.m. for the Kuakini Drainage Improvements.

— HAWAII BELT ROAD (ROUTE 19) —

1) HONOMU TO HAKALAU (WEEKEND WORK)

Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile markers 13 and 16, vicinity of Honomu Road and vicinity of Leopolino Road, on Saturday, Sept. 24, and Sunday, Sept. 25, from 8:30 a.m. to 5 p.m., for landscaping and vegetation cutting.

2) HAKALAU (WEEKEND/WEEKLY WORK)

Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile markers 14.2 and 14.3, vicinity of Kolekole Stream, on Saturday, Sept. 24, through Friday, Sept. 30, for bridge work.

3) HAKALAU (24/7 RESTRICTION)

Single lane closure over Nanue Bridge at mile marker 18.5 on Hawaii Belt Road (Route 19) for bridge repair. Details at https://hidot.hawaii.gov/highways/nanue-bridge-weight-restriction-will-be-lifted-at-noon-friday-sept-2/

4) OOKALA (WEEKEND WORK)

Single lane closure on Hawaii Belt Road (Route 19) possible in either direction between mile markers 27 and 28, Jardine Road and vicinity of Kaawalii Stream, on Saturday, Sept. 24, and Sunday, Sept. 25, from 8:30 a.m. to 5 p.m. for vegetation cutting and tree trimming.

— QUEEN KAAHUMANU HIGHWAY (ROUTE 19) —

1) KAMUELA (WEEKEND/WEEKLY WORK)

Single lane closure on Queen Kaahumanu Highway (Route 19) possible in either direction between mile markers 67 and 69, vicinity of Kawaihae Road and Hapuna Beach Road, on Saturday, Sept. 24, through Friday, Sept. 30, from 8:30 a.m. to 5 p.m., for shoulder restoration and vegetation cutting.

— KALANIANAOLE AVENUE (ROUTE 19) —

1) KEAUKAHA (NIGHT WORK)

Single lane closure on Kalanianaole Avenue (Route 19) possible in either direction between Kamehameha Avenue and Kuhio Street, nightly from 7 p.m. Monday, Sept. 26, through 5 a.m. Friday, Sept. 30, for the Kalanianaole Avenue Reconstruction. See https://hidot.hawaii.gov/highways/nighttime-paving-work-of-kalanianaole-avenue-in-keaukaha-begins-tuesday-july-5/

— KEAAU-PAHOA ROAD/ PAHOA-KALAPANA ROAD (ROUTE 130) —

1) PAHOA (WEEKEND WORK)

Single lane closure on Pahoa-Kalapana Road (Route 130) possible in either direction between mile markers 12 and 14, Pahoa Village Road and vicinity of Nunulu Road, Saturday, Sept. 24, and Sunday, Sept. 25, from 8:30 a.m. to 5 p.m., for vegetation cutting.

2) PAHOA

Single lane closure on Pahoa-Kalapana Road (Route 130) possible in either direction between mile marker 18 and 21, vicinity of Oneele Road and Kaimu Chain of Craters Road, Monday, Sept. 26, through Friday, Sept. 30, from 8:30 a.m. to 5 p.m., for tree trimming, mulching, and landscaping. Note: the tree trimming/mulching may be a separate crew from the landscaping.

— KOHALA MOUNTAIN ROAD (ROUTE 250) —

1) KOHALA

Single lane closure on Kohala Mountain Road (Route 250) possible in either direction between mile markers 9 and 13, vicinity of Ponoholu Ranch, Monday, Sept. 26, through Friday, Sept. 30, from 8:30 a.m. to 3:30 p.m. for road resurfacing.

Exit mobile version